FRA - Planning
One-point-per-FIR
In order to minimise the impact on the ATM systems, as a minimum, the route portion in ITEM 15 of FPL through SEE FRA shall contain at least one FRA significant point ((E), (X), (I), (A) or (D)) related to each FIR.