FRA - Planning
One-point-per-FIR
In order to minimise the impact on the ATM systems, as a minimum, the route portion in ITEM 15 of FPL through SEE FRA shall contain at least one FRA significant point ((E), (X), (I), (A) or (D)) related to each FIR.
Česky
In order to minimise the impact on the ATM systems, as a minimum, the route portion in ITEM 15 of FPL through SEE FRA shall contain at least one FRA significant point ((E), (X), (I), (A) or (D)) related to each FIR.